Price on request
For making and repairing traditional floors and cement underlayment in various types of floor covering inside and outside buildings, with layer thicknesses above 25mm.
Mix with water until a homogeneous mass is obtained in the proportion of 3.5 liters of water per 25 kg of dry matter. The mortar can be mixed directly and maintains its functional properties for 1 hour. After laying, the mortar is spread between leveled slats using patches with diagonal movements, collecting excess. It is recommended to use vibrating patches. After 3-4 hours, the floor surface should be smeared and smoothed with floats. R evenly made floor thickness should not be less than 2.5 cm and more than 5 cm. Work should be carried out at a temperature from +5 C to +25 C. Protect fresh floor from excessive drying by spraying with water and covering with foil. Under favorable thermal conditions, the undercoat has sufficient load-bearing capacity for walking after 24 hours, and the required service load after 14 days.
Consumption: The average consumption of IZOLBET ZP-cM20 flooring mortar is approximately 100 kg (4 bags) per 1 m of floor screed at a layer thickness of 50mm. Consumption may vary depending on the degree of unevenness of the substrate,
Packaging: 25 kg (48 pieces per pallet).